We work with some school trusts helping them with there renovations and adaptations for there specific needs all carried out when the schools are shut for there half term holidays.
HMO conversions including en-suite rooms and studio rooms with there own kitchen areas.
Hall stairs and landing area, overboarded ceilings. Repositioning electrical sockets and switches, Adding spotlights, fully plastered then for the finishing touch adding pre finished oak doors.
Room renovations, constructing a partition wall to make one large room into 2 bedrooms, insulated, overboard ceiling and full plaster. Making there space work better for them.
Period property taken back to brick work, altered electrics then overboard ceiling ensuring the original coving was not disturbed with a full re-plaster ready for new skirting and decorating.